Title & Author | Format | Holdings | Editions | From | To |
---|---|---|---|---|---|
Procedure manual for establishing, maintaining and applications of an inventory system for existing street facilities
by San Diego (Calif.). Street Division
LCC |
23 | 6 | 1958 | 1958 | |
Report on transportation financing within the City of San Diego
by San Diego Metropolitan Area Transportation Study
LCC |
15 | 2 | 1958 | 1958 | |
Estimating future auto and truck trips for populations 2.5 million, 2.0 million
by San Diego Metropolitan Area Transportation Study
LCC |
15 | 2 | 1959 | 1959 | |
Results of trucking inventory, 1959
by San Diego Metropolitan Area Transportation Study
LCC |
14 | 2 | 1959 | 1959 | |
Sorrento Valley : review of major street and highway plans
by San Diego Metropolitan Area Transportation Study
LCC |
14 | 2 | 1962 | 1962 | |
Travel characteristics of two San Diego subdivision developments
by Hall, Edward M.
LCC |
14 | 2 | 1957 | 1957 | |
San Diego State College origin-destination traffic survey
by San Diego Metropolitan Area Transportation Study
LCC |
13 | 2 | 1962 | 1962 | |
Maple Canyon Road : study of alternate routes
by San Diego Metropolitan Area Transportation Study
LCC |
13 | 2 | 1963 | 1963 | |
San Diego, the pilot city : a report to the City Council
by San Diego Metropolitan Area Transportation Study
LCC |
11 | 2 | 1958 | 1958 | |
Multiple residential parking needs study
by San Diego Metropolitan Area Transportation Study
DDC/LCC |
8 | 1 | 1965 | 1965 | |
San Diego State College 1965 origin-destination traffic survey
by San Diego Metropolitan Area Transportation Study
LCC |
7 | 2 | 1965 | 1965 | |
Results of college area parking study, 1959; : [parking, 1959]
by San Diego Metropolitan Area Transportation Study
LCC |
7 | 2 | 1960 | 1960 | |
Street deficiencies and needs : a study required by Senate Concurrent Resolution 62 and Streets and highways code
by San Diego Metropolitan Area Transportation Study
LCC |
7 | 1 | 1960 | 1960 | |
Summary report on traffic control devices inventory and inspection program
by San Diego Metropolitan Area Transportation Study
LCC |
6 | 2 | 1958 | 1958 | |
Maple Canyon Road : a supplement to 1963 studies of alternate routes
by San Diego Metropolitan Area Transportation Study
LCC |
5 | 1 | 1964 | 1964 | |
Results of a parking inventory, 1956-58 : outlaying business areas in San Diego
by San Diego Metropolitan Area Transportation Study
LCC |
4 | 2 | 1958 | 1958 | |
Parking inventory, 1966 : downtown and outlaying San Diego business area
by San Diego Metropolitan Area Transportation Study
LCC |
4 | 2 | 1966 | 1966 | |
Results of travel time study - spring 1957
by San Diego Metropolitan Area Transportation Study
LCC |
1 | 1 | 1957 | 1957 | |
Prospectus - 1964
by San Diego Metropolitan Area Transportation Study
LCC |
1 | 1 | 1964 | 1964 |