Classify

An experimental classification web service

Powered by the Classify Web Service.

Search Results

Search Criteria: author = "San Diego Metropolitan Area Transportation Study"
Displaying 1 to 19 of 19
Title & Author Format Holdings Editions From To
Procedure manual for establishing, maintaining and applications of an inventory system for existing street facilities by San Diego (Calif.). Street Division
LCC
  23 6 1958 1958
Report on transportation financing within the City of San Diego by San Diego Metropolitan Area Transportation Study
LCC
  15 2 1958 1958
Estimating future auto and truck trips for populations 2.5 million, 2.0 million by San Diego Metropolitan Area Transportation Study
LCC
  15 2 1959 1959
Results of trucking inventory, 1959 by San Diego Metropolitan Area Transportation Study
LCC
  14 2 1959 1959
Sorrento Valley : review of major street and highway plans by San Diego Metropolitan Area Transportation Study
LCC
  14 2 1962 1962
Travel characteristics of two San Diego subdivision developments by Hall, Edward M.
LCC
  14 2 1957 1957
San Diego State College origin-destination traffic survey by San Diego Metropolitan Area Transportation Study
LCC
  13 2 1962 1962
Maple Canyon Road : study of alternate routes by San Diego Metropolitan Area Transportation Study
LCC
  13 2 1963 1963
San Diego, the pilot city : a report to the City Council by San Diego Metropolitan Area Transportation Study
LCC
  11 2 1958 1958
Multiple residential parking needs study by San Diego Metropolitan Area Transportation Study
DDC/LCC
  8 1 1965 1965
San Diego State College 1965 origin-destination traffic survey by San Diego Metropolitan Area Transportation Study
LCC
  7 2 1965 1965
Results of college area parking study, 1959; : [parking, 1959] by San Diego Metropolitan Area Transportation Study
LCC
  7 2 1960 1960
Street deficiencies and needs : a study required by Senate Concurrent Resolution 62 and Streets and highways code by San Diego Metropolitan Area Transportation Study
LCC
  7 1 1960 1960
Summary report on traffic control devices inventory and inspection program by San Diego Metropolitan Area Transportation Study
LCC
  6 2 1958 1958
Maple Canyon Road : a supplement to 1963 studies of alternate routes by San Diego Metropolitan Area Transportation Study
LCC
  5 1 1964 1964
Results of a parking inventory, 1956-58 : outlaying business areas in San Diego by San Diego Metropolitan Area Transportation Study
LCC
  4 2 1958 1958
Parking inventory, 1966 : downtown and outlaying San Diego business area by San Diego Metropolitan Area Transportation Study
LCC
  4 2 1966 1966
Results of travel time study - spring 1957 by San Diego Metropolitan Area Transportation Study
LCC
  1 1 1957 1957
Prospectus - 1964 by San Diego Metropolitan Area Transportation Study
LCC
  1 1 1964 1964
Displaying 1 to 19 of 19
.