Classify

An experimental classification web service

Powered by the Classify Web Service.

Search Results

Search Criteria: author = "Messer, Carroll J."
Displaying 1 to 25 of 49
Title & Author Format Holdings Editions From To
Capacity analysis of interchange ramp terminals : final report by Messer, Carroll J.
LCC
  153 3 1997 1997
Single point urban interchange design and operations analysis by Messer, Carroll J.
LCC
  125 4 1991 1991
Effects of the quality of traffic signal progression on delay by Fambro, Daniel B.
DDC/LCC
  124 5 1991 1991
Advanced freeway system ramp metering strategies for Texas by Messer, Carroll J.
LCC
  31 3 1993 1993
Arterial signal timing optimization using PASSER II-90 : program user's guide by Chang, Edmond Chin-Ping
LCC
  28 3 1991 1991
Distance requirements for ramp metering by Sharma, Sameer
LCC
  27 2 1994 1994
Strategies for improving traffic operations at oversaturated diamond interchanges by Herrick, George Curtis
LCC
  27 3 1992 1992
Evaluation of Arlington, Texas, diamond interchange strategy by Messer, Carroll J.
LCC
  26 3 1989 1989
Evaluating urban freeway guide signing : executive summary and level of service by Messer, Carroll J.
LCC
  23 3 1981 1981
Traffic signal timing models for oversaturated signalized interchanges by Kim, Youngchan
LCC
  22 5 1992 1992
Arterial signal timing optimization using PASSER II-87 : microcomputer user's guide by Chang, Edmond Chin-Ping
LCC
  19 3 1988 1988
Effective placement of detectors at diamond interchanges by Prabhakar, Dayakar
LCC
  18 4 1994 1994
A dual-lane flow signal plan for Texas by Messer, Carroll J.
LCC
  17 4 1997 1997
A national survey of single-point urban interchanges by Bonneson, James A.
LCC
  16 3 1989 1989
Delay to frontage road vehicles at intersections with ramps by Gattis, J. L.
LCC
  16 3 1988 1988
PASSER IV-96, version 2.1 : user/reference manual by Chaudhary, Nadeem A.
LCC
  16 3 1996 1996
Traffic operations of basic actuated traffic control systems at diamond interchanges by Messer, Carroll J.
LCC
  15 3 1985 1985
Passenger car equivalencies for large trucks at signalized intersections by Molina, Cesar J
LCC
  14 3 1987 1987
Design and installation guidelines for advance warning systems for end-of-green phase at high speed traffic signals by Messer, Carroll J.
LCC
  14 2 2003 2003
A study to develop warrants for conversion to one-way frontage roads by Messer, Carroll J.
LCC
  14 2 1988 1988
A systems analysis for a real-time freeway traffic information system for the inbound Gulf Freeway corridor by Messer, Carroll J.
LCC
  14 2 1971 1971
Development of advance warning systems for end-of-green phase at high speed traffic signals by Messer, Carroll J.
LCC
  13 2 2004 2004
Analysis of reduced-delay optimization and other enhancements to Passer II-80, Passer II-84 : final report by Chang, Edmond Chin-Ping
LCC
  13 2 1984 1984
Guidelines for installing traffic signals at diamond interchanges by Chang, Myung-Soon
LCC
  12 3 1984 1984
Attitudes concerning two-way and one-way frontage roads by Stover, Vergil G., 1933-
LCC
  12 2 1988 1988
Displaying 1 to 25 of 49
.